- Unified Standard for Acceptance of Construction Quality of Building Engineering GB50300-2001
- "Building decoration engineering quality acceptance Code" GB50210-2001
- Code for Archiving and Sorting of Construction Project Documents GB/T 50328-2001
- "Fire door" GB12955-2008
- "Building Wooden Doors and Windows" JG/T122-2000
- Fire door, Zhejiang J23-95
- The relevant agreement in the bidding document of Fire door and the project design drawing
- Construction plan and overall construction scheme provided by Party A
- Product installation technical requirements and installation specifications of Shanghai Guardian Fire Engineering Co., LTD
1.1 In order to ensure the completion of the Fire door installation project in a high quality, high speed, safety and civilization, the project shall be constructed and managed in accordance with the project method. Our company will be equipped with a project manager to organize, direct, manage, coordinate and control the project construction, and set up a project manager department to establish the project management organization structure. The project department shall fully command and manage the quality, safety and schedule of the installation project to ensure the contract period and project quality. The organizational structure is as follows:
2. Construction site management personnel and responsibilities2.1 Project Manager -- Wu Xiujuan, Tel: 13601734553 (General project manager)
2.1.1 The project manager is the representative of the Company sent to Party A to be responsible for the daily affairs of the project. Liaise with Party A on behalf of the company on all matters, be responsible for the coordination with Party A, and report all kinds of information to the company at any time. Master the progress of construction and installation.
2.1.2 The project manager is fully responsible for all matters of the project at the construction site. Master the installation progress, installation quality and civilized and safe construction of Fire door Windows in the whole project.
2.1.3 Responsible for the coordination of various positions on the installation and construction site, and reasonable deployment of on-site labor. Regularly convene the installation personnel to hold work meetings, timely solve all problems on the site, to ensure that the construction period is completed as planned. And maintain contact with the company on the site related matters. Ensure the realization of the quality objectives of the ISO9001 quality assurance system and the implementation of the quality policy.
2.1.4 The project manager shall participate in the handover and acceptance work after the completion of the project.
2.2 Construction leader
2.2.1 The construction team leader shall, in accordance with the instructions of the project manager and the construction schedule, implement the daily installation tasks and quality requirements to teams and individuals, make technical disclosure, make reasonable overall arrangements for the construction, and make construction records and installation quality self-inspection records.
2.2.2 When it is found that the site does not conform to the design or changes the design or additions, the relevant personnel must be notified in writing until it is resolved.
2.3 Construction Quality Inspector
2.3.1 Construction quality inspector is the person appointed by the project manager to supervise the site construction and construction quality. Responsible for the acceptance and verification of Fire door and various accessories materials provided by the company. Make site acceptance records of products. Ensure that the products sent to the construction site must be qualified products.
2.3.2 Carefully check the product list according to the drawings provided by the technical department of the company and the installation floor plan of Party A, so that the Fire door products can be properly installed on the site.
2.3.3 Go to the site every day to check the installation quality, check the self-inspection record of the construction team leader and sign for confirmation.
2.3.4 Cooperate with the quality inspection personnel sent by the company to the site inspection, timely feedback the relevant quality information to the construction team leader and project manager.
2.3.5 Responsible for organizing and archiving quality records.
2.4 Security Officer
2.4.1 The safety officer is the person appointed by the project manager to be in charge of the safety of the construction site. Before the entire installation and construction team enters the field, the safety officer should be admitted in advance to inspect the safety situation of the construction site (water, electricity, etc.), and inform the project manager of the inspection situation in time. Responsible for urging installation personnel to pay attention to necessary safety measures. And responsible for the Fire prevention safety and health of workers' dormitories.
2.4.2 The safety officer is also responsible for the stacking safety of the wooden door products on the construction site, and assists the project manager to protect the products and materials on the site. After the installation, the remaining auxiliary materials will be recycled to the company.
(2) Construction preparation, construction process: 1, construction preparation1.1 Do a good job with the cloth of the construction site, build a good warehouse and staff living base, and prepare the construction work room.
1.2 Organize all professional construction personnel to prepare construction plans and detailed construction technical measures, quality inspectors to formulate detailed safety inspection measures and quality control procedures, to give written disclosure of technology, quality, safety and civilized construction to the workers entering the site, and explain the construction difficulties and key points of each specialty.
1.3 Prepare detailed labor demand plan, material plan, construction machinery and tools plan, determine the entry time and use arrangement of various materials, machinery and personnel, so as to make the best use of people.
1.4 Prepare the relevant professional construction technical specifications and quality inspection standards, prepare the documents and construction forms required in the construction process, and make construction records at any time.
1.5 The site management personnel often communicate and exchange with Party A, the supervisor and the general contractor, so as to grasp and be familiar with the overall arrangement of Party A at any time, and cooperate with the overall construction progress and arrangement.
1.6 Strengthen communication with other subcontracting units, mutual understanding and consideration during construction, so as not to affect the progress and ensure the normal progress of the construction period.
2, construction processFollow the construction principles, according to the actual site conditions, Civil door cavity measurement - Summary - Report to Party A to confirm the construction size of the door cavity -- order production -- door frame installation position and elevation marking -- material approach to transport the door frame and door door to the installation site -- preparation of technical solutions -- construction machinery configuration -- → Vertical Fire door frame → Wooden wedge Immobilization → Re-review of the immobilization on a horizontal line The mobilization capability is mobilization. The mobilization capability is mobilization. The mobilization capability is mobilization. The mobilization capability is mobilization. The mobilization capability is mobilization.
When selecting materials, samples must be provided in accordance with the requirements of Party A and the supervisor, and formal construction can only be approved.
Check whether the size, elevation and opening direction of the door opening meet the design requirements. The door with embedded parts should also check whether the number, location and burying method of embedded parts meet the design requirements.
(3) Engineering quality standards and assurance measuresThe Fire door frame should be installed before the opening is plastered and the ground is not of type. Before installation, pay attention to the opening direction of the Fire door according to the design and Fire protection requirements (in general, the opening direction of the Fire door is the evacuation direction). The Fire door should be installed after the completion of civil construction and decoration works to prevent collision and pollution of the Fire door due to cross-construction and other reasons.
1. Preparation for construction1.1 Familiar with drawings and selected atlas for Fire door design and installation requirements.
1.2 Check the location, size, specification, quantity and grade requirements of Fire door installation.
1.3 Check the size of the hole. If the hole is too small, it should be cut out. The horizontal control line should be fired on both sides of the door frame hole.
1.4 Clean the scum and floating slurry of the installation hole.
1.5 Technical disclosure of the installation personnel, preparation of auxiliary materials and tools.
2. Door frame construction steps and standards2.1 First, the mobilization of 0.5mm iron sheets (specifications 150-1800*350*450*0.5) has been mobilized with self-tapping screws to mobilize the door frame with a height of less than 1.5 meters, with two pieces on each side. Door frames larger than 1.5 meters and smaller than 2.1 meters, 3 pieces on each side; Door frames larger than 2.1 m, 4 pieces on each side; If the width of the door frame is less than 0.6 meters, the top and bottom of each piece; if the width of the door frame is greater than 0.6 meters and less than 1.2 meters, the top and bottom of each piece; Three pieces above and below 1.2 meters.
2.2 Check the opening direction of the Fire door, position the door frame on the hole, and use a wooden wedge to Immobilization.
2.3 Adjust the gap between the door frame and the wall of the opening and the height of the top and bottom, use the hanging hammer and the ruler (basial plate) to make the vertical and horizontal, the bottom foot of the door frame should be buried 20mm below the ground.
2.4 After correction, use cement steel nails to Immobilization the two ends of the iron at the hole of the brick wall, or use a nail gun to Immobilization the two ends of the iron sheet at the hole of the brick wall.
2.5 Check whether the installed door frame is either vertically or horizontally, or vertically or diagonally. If the deviation is within the allowable range of the specification (2-4mm), it is considered qualified before entering the next process.
3. Door construction steps and standards3.1 The door fan can be installed only after the door frame plug joint is completed and can meet the installation requirements.
3.2 When installing the door, check the opening direction of the door, the front and back sides of the door, and the Fire prevention level.
3.3 When installing the door fan, first install the door door in the mouth of the hall, pad the gap under the bottom rail with a wooden wedge and plug it tightly, and observe whether the clearance around the frame fan is suitable; The double door also depends on whether the head of the two doors is aligned and horizontal, and when it is appropriate, draw the hinge position line on the door and frame, remove the door door, install the hardware, and install the door door.
3.4 When installing Fire prevention hinges, cut grooves in the side ribs of the door, the grooves are slightly deeper than the page plate, so that the page plate will not protrude after loading. In order to make the gap above and below the door door consistent, the upper groove should be about 0.2mm deeper than the lower groove.
After the groove of the door is chiseled, the hinge plate is installed and tightened with wood screws. When the wood screw is tightened, it should not be nailed in with a hammer at one time, and should be nailed in 1/3 before screwing in. Then install the door door in the diaphragm opening, screw a wood screw into the upper and lower hinges, check the size of the gap around and adjust it properly, and then screw the other wood screws into the door one by one.
4. Basic requirements for door and hardware installation:4.1 Hinge distance The upper and lower height of the door should be 1/10 of the height of the upright, and avoid the upper and lower flutes. Press 3 hinges on each side of the height above 2.1 meters, and press 2 hinges on each side of the height below 2.1 meters. The switch should be flexible after installation.
4.2 The door lock should not be installed at the junction of the middle riser and the upright, and the door handle should be 0.9 ~ 1.05 meters away from the ground. When the fire safety sliding gate is installed, the middle line of the sliding gate is 0.9 meters from the ground.
4.3 The size of the Fire prevention cigarette strip is 2mm thick and 1.5mm wide. The Fire prevention cigarette strip is embedded in the sealing groove with resin adhesive.
4.4 The installation of door closers should meet the requirements of the specification, usually in the direction of the evacuation direction after installation, to ensure that the opening and closing are flexible.
4.5 The dark latch is installed on the upper and lower ends of the equal fan of the split type door, and there shall be no friction between the dark latch and the cover fan after embedding.
4.6 When installing the Fire prevention glass, the glass strip must be pressed tightly, and the door door must be kept without gaps, and no loosening is allowed.
5, technical requirements5.1 The quality of the door fan after installation is not less than the design quality requirements of the door fan.
5.2 The seam width and allowable deviation of wood Fire door installation shall comply with the provisions of Table 3 and Table 4 respectively.
Table 3 Gap width for Fire door installation
term |
entry |
Leave seam width mm | |
1 |
Door and mouth seam, vertical seam between fan and frame |
2~4 | |
2 |
Industrial plant double door to mouth seam |
2~5 | |
3 |
Upper seam between frame and fan |
1.0~2 | |
4 |
Gap between door and ground |
Outer door |
4~6 |
Interior door |
6~9 | ||
Rest room |
10~12 | ||
Factory gate |
10~20 |
term |
entry |
Allowable deviation mm | |
I级 |
II级 | ||
1 |
The vertical and side of the box |
3 | |
2 |
Diagonal length of the box |
2 | 3 |
3 |
Flatness of the contact surface between the frame and the fan |
2 |
5.2 The size limit deviation shall comply with the quality requirements of GB12955-2008 and the relevant requirements in the Inspection Report.
Table 5 Size limit deviation
name |
item |
Limit deviation |
Door leaf |
高度 H |
±2 |
宽度 W |
±2 | |
厚度 T |
±2 | |
Door frame |
内裁口高度 H′ |
±3 |
内裁口宽度 W′ |
±2 | |
侧壁宽度 T′ |
±2 |
5.3形位公差:Door leafDoor frame形位公差应符合《GB12955-2008》的要求和《检验报告》中的相关要求。
表6 形位公差
name |
item |
公差 |
Door leaf |
The length difference between the two diagonal lines ︳L1-L2︱ |
≤3mm |
tortuosity D |
≤5mm | |
Width bending degree B1 |
﹤2‰ | |
Bending degree B2 in height direction |
﹤2‰ | |
Door frame |
The two diagonal lengths of the inner cutting edge are different︳L1′-L2′︱ |
≤3mm |
5.4 Fitting tolerance
5.4.1 The lap size of the Door leaf and the Door frame shall not be less than 12mm.
5.4.2 The opening of the hinge side of the Door leaf and Door frame shall not be greater than the dimensional tolerance specified in the design drawings.
5.4.3 The clearance between the Door leaf and the upper frame is not more than 3mm.
5.4.4 The gap between two or more Door leaves is not greater than 3mm.
5.4.5 The clearance between the Door leaf and the lower frame or the ground shall not be greater than 9mm.
5.4.6 Gap between Door leaf and Door frame bonding surface, the gap between Door leaf and Door frame on the hinge side, the lock side and the iron surface of the upper frame are not more than 3mm.
5.4.7 The height difference between the Fire door opening frame and the Door leaf is not more than 1mm.
5.5 Flexibility, reliability, fire resistance
5.5.1 The Fire door should be opened and closed flexibly without jamming, and the opening force of the Door leaf should not be greater than 80N
5.5.2 After 500 opening and closing tests, the Fire door shall not be loose, fall off, seriously deformed or blocked.
(4) Product protection 1, product Factory protection measures1.1 Confirm the technical requirements after the production of the product, mark the type number, specification, size and left and right direction on the side of the Door frame and Door leaf, and require clear and neat handwriting to facilitate stacking and searching.
1.2 A group of at least two persons should be deployed. Before packing, prepare necessary tools, such as a baler, packing tape, plastic bag, pearl cotton, and double-layer corrugated paper.
1.3 After the production of the finished Door, a layer of plastic film paper is first covered on the Door leaf to protect the integrity of the finish and paint surface and prevent moisture. At the same time, foam corners are covered on the four corners of the Door leaf to protect the four corners of the Door leaf from being damaged. Then it is covered with a layer of pearl cotton to prevent scratches on the surface of the door body during transportation; Then cover the outer bread with a double layer of corrugated cardboard; Finally, the Fire door is Immobilization wrapped with packaging bags.
1.4 After packing is completed, lift the door to the temporary stacking area and wait for storage.
2, Fire door storage and transportation precautions1.1Fire door should be handled carefully and gently during loading and unloading by forklift.
1.2 The Fire door should be tied firmly during transportation, and extrusion and collision are not allowed. Loading and unloading should be handled lightly, strictly avoid knocking, falling, prying and other behaviors, to prevent mechanical deformation and damage to the product, affecting the installation and use.
1.3 The Fire door should be stored in the warehouse, which should be ventilated and dry, avoid contact with corrosive substances and gases, and prevent sun exposure, rain, moisture and corrosion. The bottom of the product should be flat when it is placed flat. The stacking height of the Door frame shall not exceed 1.5m, the stacking height of the Door leaf shall not exceed 1.2m, and the tilt Angle of the product shall not be greater than 20° when it is placed vertically.
3, installation and installation product protection measures3.1 The product should be handled carefully during the handling process, and must be stored in a special warehouse after being moved to the site, and the lower part of the door should be raised to prevent ground water or moisture damage.
3.2 After installing the Door frame, it is necessary to nail the guard plate to ensure that the Door frame is not easy to be damaged, the height is not less than 1.2m, and the guard plate should be lined with soft protection such as foam to prevent chafing.
3.3 Keep the plastic film paper during the installation of the Door leaf in order to protect the Door leaf surface during the installation process and prevent contamination of the finish. After the installation, the Door frame and Door leaf are covered with 1 meter high double corrugated cardboard to protect the Door frame and Door leaf from damage.
3.4Door leaf After installation, install hardware accessories, close the window and lock the door to prevent wind damage to the door body; After installation, the hardware accessories are covered with film paper to avoid rust and scratch; If the door cannot be closed temporarily, the wooden wedge should be used to prevent it from opening, and there is a special person to manage it.
3.5 If there are stains on the product during the construction process, clean it in time to avoid too long, resulting in cleaning difficulties. After installation, the Door frame and Door leaf must be wiped clean; When cleaning products, do not use alcohol, gasoline, thinner, wire and other sharp objects to wipe the Door frame, Door leaf and glass. To avoid surface hair and scratches.
3.6 After completion, wet work shall not be carried out near the finished product door to avoid contamination and prevent personnel from touching the installed finished product.
3.7 Special personnel shall be responsible for inspection of the finished door after installation, and repair the damaged Fire door in time if found.
(V) Guarantee measures for the construction periodAs a key project of the company, the manager of the company and the item will pay attention to the quality and time limit as important contents.
1, the on-site organization of the implementation of the item method of construction, the well-organized item management team to form a fast decision-making, command flexible and reliable management system, the company will from the human, material and financial resources to support the work of the item. It is implemented in strict accordance with the construction schedule, the construction period is controlled by the network plan, and the operation plan is prepared by item, so that the construction is guaranteed by ten days, by ten days and by months, and the total construction period is guaranteed by months, so that the construction is predictable and the plan is adjusted in a short time, so that the construction plan can be realized smoothly.
2, in the construction should strive to ensure the supply of funds and materials, and establish a regular coordination meeting system, timely solve the construction and production of related problems, carefully prepare the material demand plan, shortage of materials should be prepared as soon as possible, within the company to adjust the surplus and shortage, to ensure the supply of materials for the project, not due to material shortage and shutdown. 3, in the construction of the project, design changes, material replacement may be more, therefore, the construction must strictly implement the technical management system, timely adjustment of the program and plan revision work after the modification, and do a good job of manpower, material resources, and various machinery and equipment adjustment work to ensure the smooth progress of the project.4, During the construction of the project will encounter the May Day, Mid-Autumn Festival, National Day and other national festivals and agricultural busy factors, if the normal holiday will cause certain difficulties for the realization of the project period, for this reason, our company arranges general holidays do not have a holiday, according to the provisions of the labor law, pay overtime wages, shorten the holiday, before and after the holiday to organize cars to pick up workers, so that they can work at ease. When the farm is busy, the construction site pays the workers for the farm work, so that they can ask people to help harvest and transplant rice seedlings in their hometown.
5, the construction site to implement a unified arrangement of unified and balanced progress, the establishment of a weekly site professional contact system, timely solve the problems in the cross-work construction, eliminate various factors affecting the construction progress.
(6) Total package cooperation measures1. Develop complete safety measures and civilized management measures, and conduct safety and civilized education for construction personnel before entering the site.
2, implement safety inspection measures, establish a strict reward and punishment system and implementation measures, seriously deal with the problems found in the inspection, and never tolerate violations of regulations.3, strictly implement labor discipline, abide by the operation and safety operation rules, and strictly prohibit the use of equipment and appliances that do not meet the requirements.
4, materials and products stacked neatly, uniform dress, every day to fall hands clear.
5, the on-site special person is responsible for the quality, check the installed products at any time, find problems in a timely manner, and rectify the unqualified products in a timely manner. Strive to report the supervision and acceptance of products are qualified products, reduce unnecessary trouble. 6. The site management personnel often communicate and exchange with Party A, the supervisor and the general contractor, so as to grasp and be familiar with the overall arrangement of Party A at any time, and cooperate with the overall construction progress and arrangement. 7, strengthen communication with other subcontractors, intersperse the construction of mutual understanding and understanding, do not affect the progress of each other, to ensure the normal progress of the construction period. (7) Construction site civilized and hygienic measures1, the construction site is always guaranteed to be complete and clean, to ensure that there is no garbage left.
2, the site raw materials, components, machinery and equipment should be stacked neatly, keep the road unblocked. The working place should be cleared by hand and the garbage should be piled up in time.
3, each professional subcontracting team entering the site must abide by the site security, fire protection work system. Sign a safety responsibility letter. And formulate a special reward and punishment system.
4, do a good job of on-site storage and anti-theft work. For precious materials, small type production tools, etc., special custody should be implemented, and the responsibility is to the person.
5, strengthen legal education, all personnel entering the scene must consciously abide by the law. It is strictly prohibited to gather people to gamble or steal public or private property at construction sites; It is strictly forbidden to fight, make trouble without reason or disturb the normal order of production, work and life. When the above situation is found, it should be stopped in time and dealt with seriously, and if the situation is serious, it should be reported to the public security organ for handling.
6, the construction machinery must go through safety inspection, must pass the inspection, can only be used, the construction machinery operator must establish the unit responsibility system.
7, the product is shipped to the scene to be inspected, found the problem to inform the superior leadership in time, strictly prohibited installation.
8, the construction, the process must pay attention to the protection of the product, do not allow disorderly place, placed in the position must not have water and other debris.
9. Regularly check and maintain various safety facilities and labor protection equipment on the construction site to ensure safety and effectiveness. Do a good job of civilized management of the site.10, the construction site management personnel and construction personnel must be dressed in uniform and wear safety helmets.
Comprehensive of the above measures, our company will be great enthusiasm and power into this project, careful construction, careful management, to provide quality service, we are determined to make this project become a fine model of architectural decoration construction, contribute our strength.